ABSTRACT Design criteria for use by qualified engineers is presented for the design of building plumbing systems including above-ground and buried sanitary DWV (drain, waste, and vent), roof, (storm) drainage, and water piping inside and under each building and within 5 feet outside of the building walls. Plumbing systems may include buried piping beyond 5 feet outside of the building walls and connections to existing exterior distribution systems.
Section 1. PLUMBING CRITERIA 1. SCOPE
d. Protection of Computers and Other Equipment from Water Damage
Section 2. DRAINAGE SYSTEMS 1. SANITARY SYSTEMS
3. COMBINED SANITARY AND STORM DRAINAGE SYSTEM
c. P-Traps in Storm Drainage Systems
4. VENTING OF THE DRAINAGE SYSTEMS
Section 3. WATER SUPPLY SYSTEMS
4. CHILLED DRINKING WATER SYSTEMS.
Section 4. INSULATION OF PLUMBING SYSTEMS
c. Gas and Oil Fired Water Heaters .
b. Pressure Regulator Location .
b. Packaged Water Heater Heat Pump
f. Storage Tanks and Standpipes.
3. HEAT RECOVERY AIR CONDITIONING SYSTEMS
4. HEAT RECOVERY FROM REFRIGERATION.
APPENDIX A Energy Analysis Example
Ä 1 Typical Connections to Water Heaters and Hot Water Storage Tanks.
7 Solar Water Source Heat Pump
8 Heat Recovery A.C. System with Auxiliary Condenser.
9 Heat Recovery A.C. System with Desuperheater.
11 Cogeneration Heat Recovery .
12 Power and Atmospheric Burners.
2 Rainfall Intensity Based on 10-Year Frequency and 10-Minute Duration
4 HydroPneumatic Tank High Water Levels and Withdrawals (Based on bottom outlet tanks and a 10-percent residual) .
5 Correction Factors for Sizing Water Heaters and Auxiliary Equipment.
6 Hot Water Demand per Fixture for Various Types of Buildings
7 Estimated Hot Water Demand Characteristics for Various Types of Buildings
8 Water Heater Capacities for One-and Two-Family Living Units.
A-1 Summary of Water Heater Alternatives
A-2 Summary of Water Heating Alternatives.
A-3 Summary of Life Cycle Costing Inputs
FOR A LIMITED TIME, YOU WILL ALSO GET THE ''PLUMBING TRAINING'' manual, A $9.99 VALUE, FOR FREE!! must mention to receive
copyright by derivation to digital media from public domain sources by The Learning Company
graphics on this page are for illustrative purposes only; may differ from item's.



Design of plumbing systems - construction